ROMANIA · UTILITY-SCALE SOLAR · PV + BESS
Land creates the platform. Grid creates the constraint. Execution creates the project.
A utility-scale photovoltaic project is not defined by the number of hectares under discussion or by the irradiation of a region alone. It is created at the intersection of effective land control, grid strategy, cadastral integrity, permitting feasibility, technical design and capital discipline.

TBI works with developers and strategic operators seeking to originate and structure solar development platforms in Romania — from the first landowner discussion to a documented project capable of entering the next investment stage.
We do not begin with “land available for solar”. We begin with the requirements of the project.
01 · THE PROJECT FOUNDATION
Land before MW.
Every solar development begins with an apparent surface. The investor, however, does not ultimately invest in gross hectares. The investor invests in the portion of those hectares that can actually support the project.

GROSS LAND — the total surface identified.
CONTROLLED LAND — land effectively secured through ownership, lease, superficies or another appropriate contractual structure.
DEVELOPABLE LAND — land remaining after cadastral, access, planning, environmental, technical and infrastructure constraints are applied.
PROJECT CAPACITY — the MW that can realistically be designed, permitted, connected and financed on that developable surface.
Hectares are not capacity. Controlled and developable hectares are capacity’s foundation.
02 · SOLAR SITE SCREENING
Not every sunny parcel is a solar site.
Solar resource matters, but it is only one layer of site selection. Before significant development capital is committed, a potential site should be screened across the land, grid, permitting, environmental and infrastructure workstreams.
- TITLE & CADASTRAL STATUS — ownership, Land Book position, boundaries, overlaps, fragmentation and ownership history.
- LAND CONFIGURATION — parcel shape, continuity, slope, orientation and internal constraints.
- ACCESS — existing legal access, construction access and permanent operational access.
- LAND USE & AGRICULTURAL STATUS — use category, agricultural quality class, removal from the agricultural circuit and planning implications.
- GRID CONTEXT — connection zone, voltage level, existing infrastructure and the applicable capacity-allocation route.
- ENVIRONMENTAL & SPATIAL CONSTRAINTS — protected areas, water, archaeology, cultural heritage, aviation and other restrictions.
- PROJECT INFRASTRUCTURE — substation, BESS area, internal roads, cable corridors and evacuation infrastructure.
Agricultural-land planning must be tested early.
Romanian land legislation permits certain renewable-energy facilities on agricultural land situated in the extravilan, subject to statutory conditions. The legal route, agricultural quality class, affected surface and planning implications should therefore be established at the beginning of site screening rather than after land aggregation.
03 · LAND ORIGINATION & SITE CONTROL
Site control must survive due diligence.
The objective is not simply to obtain signatures from landowners. The objective is to create a coherent land platform that can support development.
Depending on the mandate, site control may involve freehold acquisition, long-term lease, superficies, promise or option structures, together with the associated rights required for the project.
- access roads;
- cable corridors;
- substations;
- BESS;
- construction areas and temporary works;
- easements and project infrastructure.
A project can control 95% of its gross area and still be blocked by the remaining 5% if those parcels contain the access route, substation position or connection corridor. Land control must therefore be measured strategically, not statistically.
Explore Solar Land Acquisition, Site Control & Superficies →
04 · GRID ACCESS 2026
Grid proximity is not grid access.
From 1 January 2026, Romania’s capacity-allocation methodology applies to relevant new electricity-production projects with installed generation capacity of at least 5 MW. The methodology also covers certain production-plus-storage and standalone storage configurations.
Capacity applications enter an allocation process within defined annual windows, with available capacity determined and allocation auctions organised where required. The 2026 framework also requires a participation guarantee when submitting the capacity-allocation request; for 2026, the applicable guarantee is EUR 20,000/MW of requested capacity.
SITE → LAND CONTROL → PROJECT DEFINITION
↓
GRID STRATEGY → CAPACITY ALLOCATION
Grid allocation has become a capital decision, not merely a technical filing.
05 · PV + BESS
Storage should be considered at project architecture stage.

A photovoltaic project and a storage project should not automatically be treated as two unrelated assets. Co-location or hybridisation can influence land requirements, substation configuration, cable routes, evacuation capacity, connection strategy, operational profile, project economics, safety and technical layout.
This does not mean that every PV project should include BESS. It means that BESS optionality should be tested before the site layout becomes rigid. The 2026 grid-allocation framework expressly incorporates relevant storage configurations, reinforcing the need to define the energy architecture early in development.
06 · DEVELOPMENT WORKSTREAMS
Development is parallel, not sequential.

A project loses time when every workstream waits for the previous one to finish. Development should instead coordinate several parallel tracks in one integrated project plan.
- LAND — site control, cadastral, access and easements.
- GRID — capacity allocation, technical studies and connection architecture.
- URBANISM & PERMITTING — urban planning route, certificates, permits and construction authorisation.
- ENVIRONMENT — screening, environmental procedures and protected-area considerations.
- TECHNICAL — layout, yield, geotechnical, electrical design, substation and BESS.
- LEGAL & CORPORATE — land contracts, SPV, project contracts, rights and conditions precedent.
- CAPITAL — development budget, grid guarantees, connection costs and FID readiness.
07 · STAGE-GATE DEVELOPMENT
Progress should be measured by evidence, not activity.
GREENFIELD
↓
SITE SCREENING
↓
SITE CONTROL
↓
GRID STRATEGY / CAPACITY ALLOCATION
↓
URBANISM & ENVIRONMENT
↓
TECHNICAL DEVELOPMENT
↓
PERMITTING
↓
RTB
↓
FID
↓
CONSTRUCTION
↓
COMMISSIONING
↓
COD
Every gate should answer one question: what has become materially more certain than at the previous stage?
08 · FROM LAND TO DEVELOPABLE MW
Gross hectares are not an investment metric.
HECTARES → CONTROLLED HECTARES → DEVELOPABLE HECTARES
↓
MWp → GRID CAPACITY → MWh
A solar site can lose effective surface through irregular boundaries, unusable parcels, setbacks, infrastructure, access, protected elements, topography, grid and substation requirements and BESS configuration.
The investor therefore needs to understand the conversion from land area to actual energy asset, not only the nominal surface presented at origination.
09 · INVESTOR-READY PROJECT
Permitted does not automatically mean bankable.
A project becomes investor-ready when its critical assumptions can be traced to documentation. A strong development package should allow a new investor, lender or investment committee to understand the project without having to reconstruct its history.
- LAND REGISTER — owners, parcels, surface, contract status, term and conditions.
- CADASTRAL PACKAGE — Land Books, plans, subdivisions and coordinates.
- GRID FILE — capacity-allocation status, connection documentation, studies and guarantees.
- PERMITTING REGISTER — urbanism, environment, approvals, permits and dependencies.
- TECHNICAL FILE — layout, capacity, BESS concept, substation, access and evacuation.
- DEVELOPMENT BUDGET
- RISK REGISTER
- DATA ROOM
- RESIDUAL-RISK SUMMARY
10 · DEVELOPER ENGAGEMENT MODEL
TBI works from mandate, not from listing volume.

We are not building a public catalogue of solar land. We work with developers and strategic operators who can define target capacity, preferred region, grid strategy, land requirements, project architecture, acceptable development stage, timetable and acquisition or development structure.
TBI then originates and filters opportunities against that mandate. This makes land sourcing repeatable and reduces the amount of time spent reviewing locations that cannot support the developer’s strategy.
The objective is a development pipeline, not a collection of unrelated sites.
11 · TBI SOLAR EXECUTION
Local origination. Controlled land. Visible execution.
TBI operates at the point where landowners, renewable-energy developers and investment capital meet. Our solar work may include site origination, landowner identification and engagement, negotiation coordination, land aggregation, cadastral coordination, subdivision and parcel structuring, access and corridor identification, acquisition / lease / superficies workstreams, local authority coordination, document and progress registers, support for investor due diligence and coordination with specialist legal, environmental, technical and grid advisers.
Where specialist engineering, legal, environmental, grid or EPC expertise is required, those workstreams should be performed by appropriately qualified professionals and integrated into the project-development process.
The objective is not to secure land around a project. The objective is to build the land platform on which the project can exist.
RELATED STRATEGIES
Farmland investment ↗ · Wind development ↗ · AgriEnergy strategy ↗
CONFIDENTIAL SOLAR MANDATE
Build a solar development position in Romania.
Tell us the target MW, region, PV / PV+BESS strategy, land profile, grid approach, development stage and timetable. TBI can then determine whether the mandate corresponds to a land and project-development opportunity that can be originated and structured locally.
Tudor Business Investments · Romania
contact@investmentsinromania.eu
Confidential information regarding individual landowners, sites and projects is disclosed only to qualified counterparties and, where appropriate, subject to confidentiality arrangements.
This page provides general market and development information and does not constitute legal, regulatory, technical, tax, investment or financial advice.